Dear Praveen

This is a good question but does not have definite answer. Actually size of blast can be determine based on following consideration:
1. Allowable vibration limits & distance from the nearest structure, type of structure etc.
2. Type of initiation system. e.g. if you are using electronic detonator, when precision of delay is very high, a larger blast can be planned vis-a-vis delay detonator where scatter is high and chances of high vibration due to more than one hole blasting at a time. Even in nonel the scatter is present and will be limiting the blast size.
3. Production requirement.
4. Equipment size & bench height.
5. Even a larger blast with one hole per delay can be planned on drawing board but the time lag between first & last hole mat cut surface trunk line due to fly rock.
There may be some more factors, which may be of site specific.

The best way to increase the size of blast is by incremental trails and monitoring all parameters, like vibration, AOP(sound), fly rock etc. By this way blast size can be optimize and specific to that mine. It may vary from mine to mine.

I hope I am able to throw some light on the aspect. However, more insight is welcome.

Best regards.

Mahendra Kumar Mehta
Sr. General Manager - Mining Support
Raw Materials & Mine Planning (RMMP)
ACC Limited, LBS Marg, Thane (W) 400604
Phone: 022 39248460 / 8379
Fax: 022 25811618
Mobile: +91 9004687936


On Thu, Feb 20, 2014 at 4:43 PM, praveen_blast dave <praveen_blast@yahoo.com> wrote:
 

Can any body suggest the maximum size of blast for P&H shovel of 9.5 cum capacity.
The bench height is 12 m.
 
Praveen Dave
Chief Manager (Mines)
Malanjkhand Copper Project



This e-mail is confidential and intended only for the use of the above named addressee. If you have received this e-mail in error, please delete it immediately and notify us by e-mail or telephone.
This e-mail is confidential and intended only for the use of the above named addressee. If you have received this e-mail in error, please delete it immediately and notify us by e-mail or telephone.

__._,_.___
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (2)
_________________________________________________________________
Directorate General of Mines Safety, Ministry of Labour & Employment, Govt. of India   
Websites: http://www.dgms.net and http://www.dgmsindia.in and http://www.dgms.gov.in
--------------------------------------------------------------------------------------------------------
If for any reason you wish to unsubscribe from DGMS Mailing List, send an email to:
dgms_mail_list-unsubscribe@yahoogroups.com
.

__,_._,___

0 comments:

Post a Comment